Table of Contents
1
88
RMS-LB 2018 with 12/20 Revisions
Introduction
2
Table of Contents
4
1.0 Scope
5
2.0 Applicability
6
2.1 Mandatory Conventions
6
2.2 Prior Systems
6
2.3 Adoption and Use
6
3.0 Qualified Contractors
6
3.1 Trained Professional
6
3.2 Contractors, Teams and Qualifications
6
3.3 Quality Management
7
4.0 General Practices
7
4.1 Assemble Building Information
7
4.2 Proposals
8
4.3 Notifications and Hazards
8
4.4 Jurisdictional Authorities
9
5.0 System Design
9
5.1 Health and Safety
9
5.2 Long-term Consideration
9
5.3 Appropriate Systems
9
5.4 Nondestructive Investigation
11
5.5 Diagnostic Investigation
15
5.6 Design Decision Flowcharts
17
6.0 ASD Systems
19
6.1 ASD Suction Points
19
6.2 ASD Piping
22
6.3 Pipe Sizing
26
6.4 ASD Exhaust Discharge
28
6.5 ASD Fan Installation
32
7.0 Sealing
34
7.1 Background and Accessibility
34
7.2 Sealant Materials
34
7.3 Accessible Slab Cracks
34
7.4 Other Openings to Soil
35
7.5 Sump and Pits
35
7.6 Membranes Over Exposed Soil
36
7.7 Sub-membrane Depressuriztion
37
7.8 Drains
37
7.9 Sealed Isolation Assemblies
38
8.0 All Systems/Methods
39
8.1 Long-term OM&M Plan
39
8.2 System Monitors
39
8.3 Electrical
40
8.4 Labeling
41
8.5 Inspection for Compliance
44
8.6 Retention With Clients
44
9.0 Post-mitigation
45
9.1 Functional Evaluation
45
9.2 Initial Radon Test After Mitigation
45
10.0 Documentation
47
10.1 Essential Information
47
10.2 When Owner-Occupied
48
10.3 Non-ASD Systems
48
10.4 Inadvertent Collateral Mitigation
48
10.5 When Not Owner-Occupied
49
Table 10.5 OM&M Plan Requirements
50
11.0 Health and Safety
51
11.1 Mitigation Installers
51
11.2 Worker and Occupants
52
12.0 Non-ASD Systems/Methods
54
12.1 All Non-ASD Methods
54
12.2 Sources of Air
55
12.3 Indoor Air Pressurization
56
12.4 Soil Air Pressurization
57
12.5 Indoor Air Dilution
58
12.6 Soil Air Dilution
58
12.7 Controls for Variable Activation
59
12.8 HVAC Repairs or Modifications
59
12.9 Buiding Materials
59
12.10 Water
59
12.11 Source Removal
59
12.12 Air Cleaning
60
12.13 Passive Methods and Systems
60
13.0 Description of Terms
62
Exhibits
65
A-1: Contractor to Client
65
A-2: Management to Staff
66
A-3: Management to Occupants
67
B: Contractor to Occupants
68
C: Temporary Systems
69
Appendic A: References
70
Appendix B: Consensus Body Members
71
RMS-LB Companion Guidance
72
CG A: Guidance to Property Owners
73
CG B: Guidance when considering Non-ASD Methods
74
CG C: Heating, Cooling and Ventilation
75
CG D: Quality Management
77
CG E: Average Operating Conditions
79
CG E: Maintenance Inspectios and Logs
83
Made with FlippingBook