Table of Contents
1
82
MALB_2014 with 1-21 Revisions
Introduction
2
Table of Contents
4
1.0 Scope
5
2.0 Before You Test
6
2.1 Which buildings?
6
2.2 When to test?
6
2.3 Test devices
6
2.4 Who should conduct the testing?
7
2.5 Summary of testing procedures
8
2.6 Client communications
9
2.7 Assemble building information
10
2.8 Test device quality control
10
Coordinate notifications
12
3.0 Test Locations
13
3.1 Ground-contact locations
13
3.2 Upper floors
13
3.3 Locations not to test
13
3.4 Large rooms/areas
14
3.5 Multi-zone HVAC
14
3.6 Inaccessible ground-contact locations
14
3.7 Choosing a room
14
3.8 Choosing a location within a room
14
Table 3.8: Test Locations Within a Room
15
4.0 Test Conditions Required
16
4.1 Closed-building protocol
16
4.2 HVAC ventilation
16
4.3 Upper floor rooms and dwellings
16
Table 4-A Essential Closed-building Requirements
16
Table 4-B New Construction, Renovations and Repairs
17
Table 4-C Additional Clarification
17
5.0 Test Procedures/Options
18
5.1 Test deployment periods
18
5.2 Occupied versus unoccupied concentrations
18
5.3 Time-sensitive testing
19
5.4 Extended testing option
20
5.5 Testing a single room or dwelling
21
5.6 New construction
21
5.7 Post-mitigation testing
21
6.0 Conducting The Test
22
6.1 Quality control of required test conditions
22
6.2 Quality control for number of valid tests
24
6.3 Quality control for devices
24
6.4 Test site documentation
25
6.5 Submitting detectors to a laboratory
25
7.0 Actions Based On Test Results
26
7.1 Action level guidance
26
7.2 When two test results disagree
26
7.3 Post-mitigation testing protocol
27
8.0 Test Reports
29
8.1 Conventions
29
8.2 Summary reports
29
8.3 Summary report attachments
35
8.4 Additional test-data
36
8.5 Other reporting and disclosures
37
8.6 Retention of records
37
9.0 Definitions
38
Exhibits
44
1. Authorizations
44
2. Client commitment
45
3. Notice prior to testing
46
4. Poster notice
47
5. Building staff instructions
48
6. HVAC descriptions
49
7. Floor plan diagram
52
8. Door hanger notice
53
Normative Appendices
54
Appendix A: Building Operating Conditions
54
A-1.0 Reporting operating condition comparisons
55
A-2.0 Calculating test conditions
55
Table A-0 Climate-zone overview
57
Zone 8 Subarctic
58
Zone 7 Very cold
59
Zone 6 Cold
60
Zone 5 Cool
61
Zone 4 Mixed
62
Zone 3 Warm
63
Zone 2 Hot
64
Zone 1 Very Hot
65
Appendix B: Occupied Versus Unoccupied
66
Appendix C: Sources Other Than Soil Gas
67
Consensus Body
69
Companion Guidance
71
CG 1 Introduction to Radon
72
CG 2 Guidance for Building Managers
74
CG 3 Descriptions of Test Devices
78
CG 4 Chain of Custody
79
CG 5 Calculating Average Operating Conditions
80
Made with FlippingBook
RkJQdWJsaXNoZXIy MTgwNDgx