Table of Contents
1
48
CC-1000_2018
CC-1000 Introduction
2
Table of Contents
3
1 Scope
4
2 Terms and Definitions
5
3 Requirement Summary
6
4 Soil Gas Collection Plenums
6
4.1 General
6
4.2 Size calculations
6
4.3 Systems per plenum size
6
Table 4.3 plenum size per pipe size
7
4.4 Collective espanses
7
4.5 Joined plenums
7
4.6 Joined systems
7
4.7 Limiting size
8
4.8 Ventilated garages not required
8
5 Plenum Construction
8
5.1 Close the bottom
8
5.2 Close the sides
8
5.3 Foundation drains
8
5.4 Footings and joined plenums
9
5.5 Gas permeable layers
9
Void space, sand, fine gravel and soil
10
5.6 Duct sizes
11
5.7 Soil gas inlets
12
5.8 Transition
13
5.9 Test ports
13
5.10 Prior to slabs or soil gas retarders
13
6 Close the Plenum Top
14
6.1 General
14
6.2 Concrete floors
14
6.3 Crawl space floors
15
6.4 Materials and installation of retarders
15
6.5 Inspect (prior to finishes)
16
7 Pressure Field Extension
16
8 Soil Gas Exhaust Vent Pipe
17
8.1 General
17
8.2 Slope
17
8.3 Prevent leakage
17
8.4 Pipe routing
17
8.5 Pipe support
18
8.6 Equivalent length
18
8.7 Piping materials
18
8.8 Joints
18
8.9 Provision for ASD fans
18
8.10 Labels
19
9 Exhaust Locations
20
9.1 General
20
9.2 Outdoors
20
9.3 Directional spread
20
9.4 Straight-line trajectory
20
9.5 Elevation above grade
20
9.6 Roof
20
9.7 Separation from openings and people
21
9.8 Protection from debris
21
9.9 Increased distances
21
9.10 Inspect (prior to finishes)
21
10 Completion of Systems
22
10.1 Labeling
22
10.2 Systems with no fan
22
10.3 Activation with ASD fan
22
11 HVAC Evaluations
23
12 Documentation
24
12.1 OM&M Plan
24
12.2 OM&M Manual
24
Table 12.1.3 OM&M plan requirements
25
12.3 Radon Testing
26
13 Chemical Vapors Intrustion
26
Annexes (non-normative)
28
Exhibits (inspection forms)
30
A-1 Prior to soil closure with slabs or retarders
30
A-2 Prior to finishes in ground contact areas
31
A-3 Prior to finishes around piping
32
Referenced Publications
33
CC-1000 Consensus Body Members
34
Companion Guidance
35
Understanding Soil Gas
36
Step-by-step for teams
36
Sections 1-4 Design
37
5 Plenum construction
38
5.5 Gas permeable layers
39
5.6 Duct sizes
41
5.7.2-5.10 Inlet ducting
44
6-7 Close the plenum & PFE
44
8 Vent pipe
45
9-13 Exhaust
46
10-13 Completion, HVAC, Documentation and Vapor Intrusion
46
Annexes (non-normative)
47
Example ASD fans
47
Made with FlippingBook
RkJQdWJsaXNoZXIy MTgwNDgx